A Brief History
JDE used to have Variable Numerator objects prior to version 8.10. This had only one screen setup to calculate the Basis (which could be a category code or a business unit), the account(s) to Allocate, and Offset settings. This was very limited and required many allocations to be configured, sometimes multi-tiered, to get to the eventual allocations a company required. The revamp of Variable Numerators, now called Advanced Variable Numerator Allocations, have the Basis and what to Allocate as full-blown Data Selection versions, opening the floodgates of possibilities. The following post uses graphics and content from the Knowledge Document KB386072, Overview of Advanced Variable Numerator Allocations (P09123/P09123A/P09123B/R09123/R09123A).
Mechanics of Advanced Variable Numerator Allocations
The Advanced Variable Numerator Allocations reside in their own submenu here:
Advanced Variable Numerator Allocations are the highest level of flexibility and are comprised of the following objects:
This is a list of real JDE customer examples I’ve used to demonstrate how these types of allocations can be used and will be referenced in the weeks to come:
The basic building blocks of an Advanced Variable Numerator are shown here:
You create versions which hold the Data Selection of the Source and Basis. (I’ve never needed to use the BU Overrides, but this would also be done prior to setting up the allocation specs.) Then with those two versions in hand, you can now build the allocation’s specifications themselves, defining everything else about the allocation. The Print Definitions is useful to confirm the configuration of the allocation, then the Compute can be run in Proof then Final. Just like the other allocations, when run in Final mode, the GL Date on the Allocation itself will be incremented forward based on your frequency and your Date Pattern. The final step is to post the "D" batch in Batch Review.
The Advanced Variable Numerator Allocations also include Burdening-Based (system 52G/48S) and Joint Venture (system 09J) Allocations. This blog series isn't covering these, but if you need more information on them, here are links to the General Accounting Implementation Guides for each:
Joint Venture-Based Allocations
Now that we've discussed high-level how these allocations work, we can dive into actual construction next week.
Do you have a cool allocation or two you'd like showcased in this Allocation Series? Let us know!